LINE 1 - PHOTOVOLTAIC AND BATTERIES SERVICES SECTOR
This subsidy line is directed to companies in the services sector, both for simple self-consumption, and for storage in batteries.
As in the 3 companies lines, we will have to wait to start the project until we have the subsidy granted.
LINE 1 - Self-consumption (batteries) installation for services sector
Who can benefit from it?
Companies and/or agrupations that offer goods and services inside the services sector
When can I start the performances?
The performances have to be initiated after presenting the application, except in cases of projects, memories, viability studies, etc. that can be eligible if they have started after the 30/06/2021
Are taxes eligible?
NO
CALCULATION OF THE SUBSIDY - PHOTOVOLTAIC
Unitary eligible cost (€/kW) = unitary cost of the generation installation (€/kW) – unitary cost of the reference installation1 (€/kW)
Total eligible cost (€) = [unitary eligible cost (€/kW) + additional unitary eligible cost2 (€/kW)] x Installation maximum power
Subsidy = total eligible cost (€) x stablished subsidy percentage1
1 Following we show how to calculate the reference installations unitary cost stablished subsidy percentages depending on the instllation type, and final destinatary:
2Additional subsidy for generation:
Additionally, in the lines there will be an extra 5% subsidy on installations in villages under 5.000 inhabitants or rural villages under 20.000 inhabitants with urban cores under 5.000 inhabitants.
CALCULATION OF THE ELIGIBLE SUBSIDY - BATTERIES
Storage eligilbe cost (€) = Unitari storage eligilbe cost (€/kWh) x storage system capacity (kWh)
Subsidy = Total storage eligilbe cost (€) x stablished subsidy percentage3 i 4
3Installations xamimum unitary eligible costs and stablished subsidy percentages depending on the installation type and final destinatary (new self-consumption installations)
POSSIBLE SUBSIDIES EXEMPLES
10 kW photovoltaic self-consumption installation without batteries, in a company:
Small business: 45% of the total cost
Medium business: 25% of the total cost
Big company: 15% of the total cost
In small villages, addicional 5% subsidy
If you want to recieve more information or ask for a quotation, click HERE!
10 kW photovoltaic self-consumption installation with 10 kWh batteries, in a company:
Small business: 45% of the total generation cost + 65% of the total storage cost
Medium business: 25% of the total generation cost + 55% of the total storage cost
Big company: 15% of the total generation cost + 45% of the total storage cost
In small villages, addicional 5% subsidy
Additional subsidy – asbestos elimination: 660 €/kWp x 10 kWp =6.600 €
Additional subsidy – canope installation: 500 €/kWp x 10 kWp = 5.000 €
If you want to recieve more information or ask for a quotation, click HERE!
50 kW photovoltaic self-consumption installation without batteries, in a company:
Small business: 45% of the total cost
Medium business: 25% of the total cost
Big company: 15% of the total cost
In small villages, addicional 5% subsidy
Additional subsidy – asbestos elimination: 660 €/kWp x 50 kWp =33.000 €
Additional subsidy – canope installation: 500 €/kWp x 50 kWp = 25.000 €
If you want to recieve more information or ask for a quotation, click HERE!
100 kW photovoltaic self-consumption installation without batteries, in a company:
Small business: 45% of the total cost
Medium business: 25% of the total cost
Big company: 15% of the total cost
In small villages, addicional 5% subsidy
Additional subsidy – asbestos elimination: 660 €/kWp x 100 kWp =66.000 €
Additional subsidy – canope installation: 500 €/kWp x 100 kWp = 50.000 €
If you want to recieve more information or ask for a quotation, click HERE!